CUSTOMIZATION PROCESS

State Item Description Lead Time
S0 RFQ

Request For Quotation

Customer provide SCH design,PCB gerber, BOM list, specification, or sample for us evaluation.If confirmed that we can take it on, we will provide a rough quotation for referene. 5-7 days
S1 Kick off  then will build a design team, Development schedule, Kick off meeting 1 days
S2 EVT

Engineering Verification Test

ID design, SCH design, PCB design, 3D drawing design(for finished products), function debug, thermal debug, emi debug, ems debug, EVT test, EVT design review, first sample delivery to customer. 3-4 weeks
S3 DVT

Design Verification Test

DQA testfunction, derating, thermal, MTBF, e-cap life, emi, ems, safety, reliability testing… etc, DVT design review, Simple Moldsingle die. 4-5 weeks
S4 PVT

Pilot run Verification Test

BOM & Design Documents into Erp and OA,  Material preparation, Preparation of fixtures and tools, trial-production, Trial production summary meeting, Trial production report, cpk data, Application for safety certification, formal mold. PVT design review. 3-4 weeks
S5 MP

Mass Production

Capacity Data, Quality Data…etc. 4-5 weeks

Remark: If customer has own design, then we will start from samples.